DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw

Product Details
Customization: Available
Connector Type: CCS1, CCS2, CHAdeMO, GB/T
Installation: Floor Type
Still deciding? Get samples of US$ 5000/Piece
Request Sample
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Years of Export Experience
The export experience of the supplier is more than 10 years
Experienced Team
The supplier has 8 foreign trading staff(s) and 8 staff(s) with over 6 years of overseas trading experience
to see all verified strength labels (21)
  • DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
  • DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
  • DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
  • DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
  • DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
  • DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
Find Similar Products
  • Overview
  • Product Parameters
  • Company Profile
  • Exibitions
  • FAQ
Overview

Basic Info.

Number of Charging Interfaces
One Pile with Multiple Charges
Electrical Paramerter
60kw/120kw/160kw/180kw/240kw
Connection Type
DC Port Complies to IEC62196-3 CCS-2
Input Cord
3-Phase with 5 Wires
Output Cable
DC Port Complies to IEC62196-3 CCS-2
IP
IP54
Ik
Ik08
Operating Temperature
-20 Degree/+50 Degree
Connectivity
Ocpp1.6j Protocol
Optional
Color Customization
Standards
IEC61851-1
Certification
CE, Ukca, SAA Compliance
After-Sales Service
Provide After-Sales Service Solutions
OEM Service
Yes
Applications
* Residential /Commercial/Public Parking Lot
Transport Package
Carton Box
Specification
800mm x 600mm x 1750mm
Trademark
ODM
Origin
China
Production Capacity
4200-8400 PCS/Month

Product Description

Features:
1.Modularize design, convenient to expand and maintain.
2.Supports multiple payment methods
3.Options: Home power balance EMS; 4G Module; Color customization

Applications:
* Commercial Area
* Public Parking Garage

Product Parameters

General Parameter

Power

60kW DC

120kW DC

160kW DC

Dimension

800mm x 600mm x 1750mm

Input

AC Supply System

3-phase with 5 wires

Input Voltage

400V AC (±10%) 45-65Hz

Enviroment Parameter

Environment Temperature

  -20ºC/+50ºC

Humidity

5%-95%

Mechanical Parameter

Mechnical Stability

IEC61851-1

IP Level

IP54

Cooling Method

Forced air cooling

Output

Port Output(60kW)

Single port 150A Max at 200-750A

Port Output(120kw&160kW)

Single port 250A Max at 200-750A

Port Compatibility

DC Port complies to IEC62196-3 CCS-2

Efficiency

≥95% (Rated output power)

Power Factor

≥0.99 ( Full Load )

Communication between EVSE and CMS

OCPP1.6J Protocol

User Interface and Display

Measurement

Grid-responsive metering is performed based on the unit consumption of each vehicle

Company Profile


DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
Starting in 2005, Milestar has been producing energy-saving lamp and LED products to make our contribution to energy conservation, yet, The current global climate problem remains prominent, The development of new energy vehicles has brought hope for replacing fossil fuels and reducing carbon emissions, EV charger, as one of the supporting facilities for new electric vehicles, is an indispensable product to support the popularization of new energy vehicles.

  Based on the historical experience and accumulation of electronic schemes, Milestar is committed to providing stable, reliable and safe products for existing and new customers and doing a good job in the logistics support for new energy vehicles for each family
 

DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
Production and testing site
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
 
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
 

Exibitions

DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw
DC Fast EV Charger with Bi-Plugs CCS-2 and GB/T or Others Output From 120kw/180kw to 240kw

 

FAQ

Q 1: Are you a factory or a trading company?
A: We are a factory almost 20 years experience, specializing in LED lighting products, and now we are entering into EV charger industry three years ago from 2020 as most of our production equipments are suitable for EV charger producing, and we have our own exporting license as well. So A manufacturer with exporting license. If you have trading demands, we are able to work as well.

Q 2: Where can I get the price?
A: We usually quote within 24 hours after we receive your inquiry. If you need a price urgently, please call us or let us know by email so that we can response immediately. Our sales are quite fluent in English.

Q 3: Can I order a sample of the EV charger?
A: Yes, very welcome to order samples to test and check the quality before bulk orders.

Q 4: What is your capacity per month?
A: If it is one shift, it will be 168 pieces per day and then 4200 pieces in a month.
   If it is two shifts, It will be 336 pieces per day and then 8400 pieces in a month.

Q 5: Do you test all goods before delivery?
A: Yes, we do 100% testing before delivery.

Q 6: Can I print my logo on the charger?
A: Yes, We are ODM manufacturer. Mainly produce with brands of customers.

Q 7: What is your delivery time usually?
A: Based on the order quantity and also sales season as well, you can take Q4 questions as reference and then consider the quantity you are going to purchase, roughly takes around 15-30 days.

Q 8:How long does charging take?
A: Charge time is dependent on your EV battery's capacity and the charger's power. Take a 7.4kW domestic fast charger for example, an average EV (with a 60kW battery) can take about 8 hours to charge to a 100%, while on a 3.7kW portable charger, it takes 12 hours to be full. DC fast chargers at 50kW+ can add 60-200 extra miles within just 20-30 minutes. Top-up charging is common as it is quicker for EV batteries to reach 80% battery than it is to charge the last 20%.

Q 9: Are home EV chargers safe?
A: Generally speaking, yes. But if your home requested an re-wiring, It must hire a licensed or professional electrician wiring your charger's outlet and breaker. Make sure your home's wiring is up to the task before plugging a charger in.   


Contact us to learn more!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier